fbpx

Feltham Station Team Hits Milestone

Congratulations to our team at Feltham who have safely and successfully achieved the ORR milestone in decommissioning the notoriously dangerous Feltham West Level Crossing.

Pedestrians can now cross the railway using the temporary footbridge which was installed during a recent 27 hour possession.

With an overall span of 24m and limited working space, the team used meticulous and precision planning to use a Kirow 1200 Rail Crane to lift the significant structure into position.

X