3D Modelling and Animation Minimise Disruption During Bridge Replacement

Portsmouth

Customer
Network Rail
Location
Portsmouth
Contract
One Team Wessex

Replacing an over-road rail bridge proceeded smoothly thanks to 3D modelling and real time data capture.

Issue

The Burnaby Road Bridge is located between Portsmouth Harbour station and Portsmouth & Southsea station. A new over-road rail bridge was required to replace the existing worn out structure.

Precise planning was needed to ensure there was minimal disruption while the replacement bridge was installed. Allowing site teams to access and capture digital data using iPads was essential to ensure that work flowed smoothly and to plan, and that asset data was collected for an efficient handback process.