fbpx

BIM Level 2 for Bridge over the Mersey

Stockport

Customer
Stockport Metropolitan Borough Council
Location
Stockport
Contract
Design and Build

“I am looking forward to the collaborative delivery of the Stockport Interchange Bridge by Osborne and Stockport Council which will be the first Level 2 BIM Bridge project in Stockport” – Alex Bremner, Design & Improvement Manager for Stockport Council

Issue

Could BIM Level 2 workflows assist in the design, construction and maintenance of a new road bridge over the River Mersey at Stockport?  Of course the answer is yes, particularly where the bridge design requires passive provision for near future ‘metro-link’ enhancements.

But what is the best way for a local authority, new to Building Information Modelling (BIM), to procure a Level 2 BIM scheme?

X
View interactive map