fbpx

Brunel Place -Offsite manufacturing led to design, time and cost efficiencies

Crawley

Customer
Crawley Borough Council
Value
£2.9m
Location
Crawley
Contract
Two-stage Design and Build

“An open, collaborative relationship allowed for all relevant matters to be discussed as the project progressed- this approach led to an efficient use of time, enabling speedy solutions when needed.” – David Starr, Team Leader, Sussex Building Control

Issue

The construction of 22 flats of 100% affordable housing over six storeys and the project brief required Osborne to:

  • Meet specific requirements for the Code for Sustainable Homes (CfSH) Level 4 and the Lifetime Homes criteria through using efficient and economical construction techniques
  • Deliver environmentally-friendly accommodation to enable sustainable living patterns and reduce running costs for residents
  • Support the local community
X